RCR Wireless
  • News
  • Channels
    • 5G
    • 6G
    • BSS OSS
    • Carriers
    • IoT
    • Network Infrastructure
    • Open RAN
    • Private 5G
    • Telco AI
    • Telco Cloud
    • Test & Measurement
  • Resources
    • Reports
    • Webinars
    • White papers
    • AI Fundamentals
    • Analyst Angle
    • Editorial Calendar
    • Fundamentals
      • 5G NR Release 17
      • AI
        • Telco AI in 2025
    • Podcasts
      • Let’s Get Digital with Carrie Charles
      • Wireless Connectivity to Enable Industry 4.0 for the Middleprise
      • Well Technically…
      • Will 5G Change the World
      • Accelerating Industry 4.0 Digitalization
  • AI Infrastructure
  • Programs
  • Events
  • RCRtv
  • Advertise
  • Subscribe
Wednesday, July 29, 2026
RCR Wireless
  • News
  • Channels
    • 5G
    • 6G
    • BSS OSS
    • Carriers
    • IoT
    • Network Infrastructure
    • Open RAN
    • Private 5G
    • Telco AI
    • Telco Cloud
    • Test & Measurement
  • Resources
    • Reports
    • Webinars
    • White papers
    • AI Fundamentals
    • Analyst Angle
    • Editorial Calendar
    • Fundamentals
      • 5G NR Release 17
      • AI
        • Telco AI in 2025
    • Podcasts
      • Let’s Get Digital with Carrie Charles
      • Wireless Connectivity to Enable Industry 4.0 for the Middleprise
      • Well Technically…
      • Will 5G Change the World
      • Accelerating Industry 4.0 Digitalization
  • AI Infrastructure
  • Programs
  • Events
  • RCRtv
  • Advertise
  • Subscribe
Add RCR Wireless as a preferred source on Google
  • Qualcomm 6G Insights
  • Huawei Content Hub
  • Qualcomm – 6G Vision
  • OSS/BSS Channel
  • RCRTech Roundtable: AI Infrastructure
RCR Wireless
RCR Wireless
  • Advanced Mimo
  • Mobile mmWave
  • 5G Positioning
  • Green Networks
  • Metaverse
  • Automotive
  • Industrial and Wide-area IoT
Copyright 2021 - All Right Reserved
Home - Wireless providers protest backup-power reporting regs : T-Mobile USA says it’s ‘recordkeeping for recordkeeping’s sake’
TowersWireless

Wireless providers protest backup-power reporting regs : T-Mobile USA says it’s ‘recordkeeping for recordkeeping’s sake’

by RCR Wireless News November 6, 2008
written by RCR Wireless News November 6, 2008 Share
LinkedinEmail
Share 0LinkedinEmail
165

The cell-phone and tower industries urged the Bush administration to reject backup-power reporting requirements, arguing the Federal Communications Commission grossly underestimated time, operational and financial burdens placed on wireless providers.
Indeed, wireless providers argue information collection guidelines associated with the eight-hour cell site backup-power mandate could trigger unintended consequences that are at odds the government’s objective to maintain communications during and after major storms like the one – Hurricane Katrina – that prompted FCC action.
The administration could rule within days.
While the FCC estimates it will cost each wireless carrier approximately $312,600 to adhere to backup-power information collection requirements, the wireless industry predicts the financial hit would be exponentially greater.
“The backup-power rule does not reasonably further, but rather undermines, the goal of emergency preparedness,” stated cellular association CTIA. “The FCC itself has acknowledged that wireless carriers may be forced to find new locations for cell sites, thus temporarily decommissioning those sites, where compliance with the backup-power rule is not possible. Yet decommissioning cell sites, even temporarily, could disrupt important public and private emergency communications and networks. . By forcing [carriers] to decommission cell sites that cannot be made compliant, the backup-power rule would undercut its own stated emergency preparedness goals. The FCC’s failure to craft its rules to meet this challenge is nothing short of capricious. Further, in order to comply with the commission’s rules, carriers would not be able to move assets around in the event of a disaster – as they did recently during Hurricanes Gustav and Ike-because they would be out of compliance in the areas from where the assets were moved. The outcome is counter to the goal of improving safety in areas impacted by disasters.”

OMB review under way
The Office of Management and Budget is reviewing comments – many echoing CTIA’s concerns – about whether the reporting requirements comply with the Paperwork Reduction Act. Even if OMB rules against the FCC on the information collection matter, the commission – as an independent federal agency – is not bound by the outcome. FCC Chairman Kevin Martin has been a strong supporter of public safety since taking over the agency in March 2005.
The U.S. Court of Appeals for the District of Columbia Circuit – which put the FCC’s backup-power decision on hold in February and held oral argument in May on appeals filed by CTIA, Sprint Nextel Corp. and USA Mobility Inc. – said in July it would not issue a ruling until after the OMB review is completed. The FCC appeared to be on the defensive for much of the oral argument before a three-judge panel of the D.C. Circuit in May. The key issue before the court is whether the FCC overstepped its authority in putting in place the backup-power rule and accompanying information collection requirements.
The guidelines call for a minimum 24 hours of emergency backup power for telecom assets inside central offices and eight hours for other facilities such as cell sites, remote switches and digital loop carrier system remote terminals. There are about 200,000 cell sites in the United States, with tower companies operating about 115,000 sites and operators controlling 85,000 sites.
“Wireless infrastructure providers, which are in the best position to accurately assess the paperwork burden of the [FCC] order, have with a consistent voice stated that the commission’s requirements are totally erroneous and unrealistic,” stated PCIA, an association representing the nation’s top tower companies.
The backup-power rule was approved last year, following recommendations in 2006 by the Independent Panel Reviewing the Impact of Hurricane Katrina on Communications Networks. The FCC responded to protests by partially modifying the rule and extending auditing and compliance deadlines.
But the changes are not nearly enough for wireless operators.

A minute per site
“Although the commission has revised slightly its estimate of the time it will take carriers to comply – from 70.32 hours to 96 hours – this minor upward revision does not come close to quantifying the actual burden imposed in respondents,” MetroPCS Communications Inc. stated. “For example, under the old estimate, MetroPCS demonstrated that it would have slightly less than one minute and fifteen seconds per site to gather, assemble and submit the required information based on the number of sites MetroPCS had deployed more than a year ago. Under the revised estimate, MetroPCS will be able to spend an additional 30 seconds per site; still far below the actual time required. And, the commission has steadfastly refused to modify its compliance deadline, requiring compliance with the enormously time-consuming reports called for under Section 12.2 (c ) of the commission’s rules with an unworkable six-month timeframe after the date of publication of the OMB control number in the Federal Register.”
The FCC backup-power rule gives wireless providers six months to determine which assets comply with the new guidelines and to ascertain which facilities are exempted for safety reasons. Carriers with wireless facilities covered by the new rule, but not in compliance, must rectify the situation or file an action plan within 12 months on how they intend to meet new federal requirements.
“The FCC has dramatically understated the burden that the new information collection requirements will present for carriers,” T-Mobile told OMB. “And, despite, the overwhelming burden that will result from these obligations, the information yielded will be of no practical utility: submission of the requested information is unnecessary to effectively ensure the provision of the mandate levels of backup power. In fact, by demanding time and resources be devoted to recordkeeping for recordkeeping’s sake, the proposed information collection requirements will divert scarce carrier resources from providing service, upgrading and maintaining the network, and, of course, from responding to real and present disasters like Hurricanes Ike and Gustav.”

You Might Also Like
  • China Tower shifts to ‘digital’ and ‘intelligent’ towers
  • Inwit defends tower contracts amid dispute with Italian carriers
  • Verizon’s Srini Kalapala on betting on AI and edge computing
  • TIM CEO outlines the telco’s tower strategy
  • T-Mobile bets on hybrid broadband with 5G FWA and Starlink
  • American Tower raises outlook on AI, data demand
Share 0 LinkedinEmail
RCR Wireless News

previous post
Frustrated with tracking capabilities, father forms LBS company
next post
Economy, iPhone drag at T-Mobile USA’s Q3: Analyst: No. 4 carrier lost customers to AT&T Mobility

White Papers

  • Norton eBook: The 2026 Telco Playbook

  • Enea White Paper: Why Intelligent AAA is the Swiss Army Knife of Telecom

  • CSG White Paper: Telco AI Enabler: Mediation’s Defining Role

  • Enea White Paper: Scalable Database Design for 5G and Beyond

  • Supermicro and NVIDIA Whitepaper: Powering sovereign AI at scale

Editorial Reports

  • Market Pulse Report: Telco AI in 2026 – Trends, Challenges and Opportunities

  • Nvidia Report: The State of AI in Telecommunications: 2026 Trends

  • Report: Scaling Optical Networks For The Hyperscale And AI Era

Webinars

  • Webinar: Building 6G — aligning technology, policy and purpose

  • SIMCom Webinar: Scaling your next deployment – from plastic to provisioning

  • Webinar: Rethinking the RAN as AI, cloud and openness converge

  • Webinar: Scale-Up, Scale-Out, Scale-Across – Building AI-Era Network Fabrics

  • Webinar: NTN in motion – evolving standards, expanding services

Since 1982, RCR Wireless News has been providing wireless and mobile industry news, insights, and analysis to mobile and wireless industry professionals, decision makers, policy makers, analysts and investors.

Facebook Twitter Youtube Linkedin Envelope Rss

Useful Links

  • Subscribe
  • About RCR Wireless News
  • Contact Us
  • Advertise
  • Editorial Calendar
  • Archive
  • RSS
  • Wireless News Archive
  • Subscribe
  • About RCR Wireless News
  • Contact Us
  • Advertise
  • Editorial Calendar
  • Archive
  • RSS
  • Wireless News Archive

Edtior's Picks

Beyond the Hype: Ilissa Miller on Responsible Growth, Data Centers and AI
The rise of agentic infra – why NetOps must outpace AI ambitions (Reader...
The 6G AI uplink panic (Analyst Angle)

Latest Articles

Beyond the Hype: Ilissa Miller on Responsible Growth, Data Centers and AI
The rise of agentic infra – why NetOps must outpace AI ambitions (Reader Forum)
The 6G AI uplink panic (Analyst Angle)
Tuesday (telco diary) | D2D in 3D – Amazon appeals to telcos

© 2026 RCR Wireless News All Right Reserved. Developed by Eight Hats.

Cookie Policy | Privacy Policy

RCR Wireless
  • News
  • Channels
    • 5G
    • 6G
    • BSS OSS
    • Carriers
    • IoT
    • Network Infrastructure
    • Open RAN
    • Private 5G
    • Telco AI
    • Telco Cloud
    • Test & Measurement
  • Resources
    • Reports
    • Webinars
    • White papers
    • AI Fundamentals
    • Analyst Angle
    • Editorial Calendar
    • Fundamentals
      • 5G NR Release 17
      • AI
        • Telco AI in 2025
    • Podcasts
      • Let’s Get Digital with Carrie Charles
      • Wireless Connectivity to Enable Industry 4.0 for the Middleprise
      • Well Technically…
      • Will 5G Change the World
      • Accelerating Industry 4.0 Digitalization
  • AI Infrastructure
  • Programs
  • Events
  • RCRtv
  • Advertise
  • Subscribe
RCR Wireless
  • News
  • Channels
    • 5G
    • 6G
    • BSS OSS
    • Carriers
    • IoT
    • Network Infrastructure
    • Open RAN
    • Private 5G
    • Telco AI
    • Telco Cloud
    • Test & Measurement
  • Resources
    • Reports
    • Webinars
    • White papers
    • AI Fundamentals
    • Analyst Angle
    • Editorial Calendar
    • Fundamentals
      • 5G NR Release 17
      • AI
        • Telco AI in 2025
    • Podcasts
      • Let’s Get Digital with Carrie Charles
      • Wireless Connectivity to Enable Industry 4.0 for the Middleprise
      • Well Technically…
      • Will 5G Change the World
      • Accelerating Industry 4.0 Digitalization
  • AI Infrastructure
  • Programs
  • Events
  • RCRtv
  • Advertise
  • Subscribe
@2020 - All Right Reserved. Designed and Developed by PenciDesign