The unemployment rate ticked up to 8.7% in the telecommunications sector in April, following the national unemployment rate, which also rose to 9.9%, the U.S. Bureau of Labor Statistics reported.
The telecommunications sector lost 6,700 jobs from March to April, according to recent figures. A total of 934,500 jobs are categorized in that sector.
Employment in the wireless sector remained relatively flat, down 200 positions from February to March, with 195,400 positions assigned to the wireless sector, according to the Labor bureau. Its wireline sibling didn’t fare as well, losing 3,900 positions in March; 607,900 jobs are in the wireline carrier segment. California, which employs most people in the telecommunications carriers segment, lost 1,200 positions to total 107,900 positions in March. Texas lost 400 jobs to total 89,900 telecommunications sector positions. Georgia’s telecom sector lost 200 positions to 50,600, as did New York, which now counts 49,800 positions. Kansas lost 100 positions to total 19,800. New Jersey bucked the trend by adding 200 positions to total 37,400. All data is preliminary and likely will be adjusted during the month. Sixteen mass layoffs took place in March, the most recent month for which data is available.
Overall the computer and electronic products segment added 100 jobs from March to April to reach 1.0298 million jobs. Drilling down into that sector, the semiconductor and components sector added 1,600 jobs in April, while the communications equipment sector lost 100 positions. Computer and peripheral equipment added another 300 jobs, which was offset by 1,300 jobs lost in the electronic instruments category.
Telecom unemployment inches up in April
ABOUT AUTHOR
Jump to Article
What infra upgrades are needed to handle AI energy spikes?
AI infra brief: Power struggles behind AI growth
The IEA report predicts that AI processing in the U.S. will need more electricity than all heavy industries combined, such as steel, cement and chemicals
Energy demand for AI data centers in the U.S. is expected to grow about 50 gigawatt each year for the coming years, according to Aman Khan, CEO of International Business Consultants
AI infra brief: Power struggles behind AI growth
The IEA report predicts that AI processing in the U.S. will need more electricity than all heavy industries combined, such as steel, cement and chemicals
Energy demand for AI data centers in the U.S. is expected to grow about 50 gigawatt each year for the coming years, according to Aman Khan, CEO of International Business Consultants